Sample Estimate |
| This is to show the estimating style only; the labor and material may have to be Adjusted. |
| CONTRACTOR: Boston College |
PROJECT: Conte Forum |
| SECTION Distribution Emergency. |
OTHER |
Discription |
QUANT |
COST |
EXT |
LABOR |
EXT |
NOTES |
| |
|
|
0 |
|
0 |
|
| Emergency Generator(Existing) |
1 |
50 |
50 |
8 |
8 |
|
| 250A weatherproof circ bkr. |
1 |
400 |
400 |
5 |
5 |
|
| 3" PVC |
150 |
5 |
750 |
0.16 |
24 |
|
| 350 MCM-CU-XHHW |
600 |
2.35 |
1410 |
0.04 |
24 |
|
| #4 |
150 |
0.399 |
59.85 |
0.02 |
3 |
|
| 3 " rigid elbows |
2 |
10 |
20 |
0.1 |
0.2 |
|
| 12 x12 x 12 x 6 JB |
1 |
50 |
50 |
8 |
8 |
|
| Pyrotenax # 1/3/0-641 |
640 |
|
0 |
0.07 |
44.8 |
|
| 260 Amp ATS |
1 |
2000 |
2000 |
8 |
8 |
|
| 250 MCM-CU-XHHW |
140 |
1.54 |
215.6 |
0.04 |
5.6 |
|
| 3" EMT |
10 |
5 |
50 |
0.16 |
1.6 |
|
| PNL EPP |
1 |
1000 |
1000 |
20 |
20 |
|
| Pyrotenax # 1/1/0-521 |
150 |
|
0 |
0.07 |
10.5 |
|
| Supports for pyrotenax cable |
15 |
2 |
30 |
0.5 |
7.5 |
|
| Existing elevator disc |
1 |
0 |
0 |
5 |
5 |
|
| Remove feeders to existing elv |
1 |
0 |
0 |
16 |
16 |
|
| 4DD/25A fused disconnect |
1 |
250 |
250 |
16 |
16 |
|
| 3" EMT |
120 |
5 |
600 |
0.16 |
19.2 |
|
| 250 MCM-CU-XHHW |
600 |
1.54 |
924 |
0.03 |
18 |
|
| #4 |
150 |
0.399 |
59.85 |
0.02 |
3 |
|
| PNL EKP2 |
1 |
1000 |
1000 |
20 |
20 |
|
| Pyrotenax #1/8-298(4 runs) |
800 |
. |
0 |
0.07 |
56 |
|
| |
. |
. |
0 |
. |
0 |
|
| Existing circ to EKP2 |
1 |
0 |
0 |
80 |
80 |
|
| |
. |
. |
0 |
. |
0 |
|
| Load bank test |
1 |
1000 |
1000 |
. |
0 |
|
| 1/2 EMT |
100 |
0.32 |
32 |
0.04 |
4 |
|
| 1/2 Thhn |
100 |
0.053 |
5.3 |
0.007 |
0.7 |
|
| OMIT CORING |
. |
. |
0 |
. |
0 |
|
| TOTALS |
. |
. |
9906.6 |
. |
408.1 |
|
| {Lighting} {Power} {distr-nor} {distr-emr} {alt-emer} {FA} {tel, cable, emerg, call} {misc}{totals} |
*RS means labor units are used (or your own) along with calling your supplier for current prices.
*All takeoff methods have their advantages and disadvantages
our take off method uses excel spread sheets
develped by us and tailord to your specific job. This allows for a much easier access when addendum and change
orders occur. All fixture and panel schedules along with the notes and symbol legends are shown on the estimates.
*All efforts are made to keep your risks at a minimum; however Electrical Cost Estimating assumes no responsibility
for any loss resulting from its use. All estimates need to be double checked by contractor. |